Issue 1.0
6 - 84
2.
Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash.
3.
Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the CD-2BRIA and/or PZ-2BRIA
daughter board.
5.4.3
Connectors
Table 6-45 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
the pin-outs for the RJ-45 cable connector for S-Bus and T-Bus
connections. Refer to
Board on page 6-82
connectors on the PZ-2BRIA daughter board.
Table 6-45 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status
LED flashes slow.
Once connected, the ISDN Layer Link
Status LEDs are on steady when the
Layer I link is established. If there is no
link, the LED is off.
Figure 6-26 Installing the PZ-2BRIA Daughter
for an illustration showing the location of the
RJ-45 Cable Connector – CN7, CN8
Pin No.
1
2
3
4
5
6
7
8
Installing the SV8100/SV8300 Blades
UNIVERGE SV8100/SV8300
Connection
—
—
TA
RA
RB
TB
—
—
show