Issue 1.0
5 - 18
4.
Install the five rubber feet to the bottom of the chassis.
Figure 5-16 Install Rubber Feet
5.
Position the CHS1U-US and CHS2U-US chassis on top of the
CHS BASE UNIT.
6.
Secure the chassis to the CHS BASE UNIT using screws
supplied with the CHS STAND KIT (K).
Figure 5-17 Install CHS2U JOINT BRACKET KIT
7.
Connect the ground wire to all chassis. Refer to
19" Chassis Grounding on page 5-46
grounding the system.
UNIVERGE SV8100/SV8300
3.5.7 Install
for complete details on
Installing the SV8300 Chassis