Toro Reelmaster 3100-D Service Manual page 127

Hide thumbs Also See for Reelmaster 3100-D:
Table of Contents

Advertisement

Reel Circuit Testing − Manifold Relief Valve (SV) Pressure Test
(continued)
Reelmaster
®
3100-D/3105-D
20252SL Rev A
10. Engage cutting units.
11. Watch pressure gauge carefully while slowly closing the flow control valve.
12. System pressure should reach 207 Bar (3000 PSI) before the relief valve
opens.
13. Set throttle to low speed and shut off engine.
14. If specification is met, test pump (P1) flow (see
Pump (P1) Flow Test (page
valve (EV) solenoid, clean or replace valve (see
Manifold (page
5–113)) and retest.
15. Disconnect tester from manifold and hose. Reconnect hydraulic hose to
manifold fitting for port (M1).
5–52)). If specification is not met, test relief
Page 5–51
Reel Circuit Testing − Gear
Servicing the Hydraulic
Hydraulic System: Testing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 3105-d031700317103174

Table of Contents