Sampling Time With Largest Total Utilization / T_Sampl Lg Total; Sampling Times Utilization Calculated / T_Sampl Util Calc - Siemens SINAMICS G150 Manual

Drive converter chassis
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

2 Parameters
2.2 List of parameters
Note:
Re index 1:
The value shows the total computing time load of the system.
Re index 5:
The total utilization is determined using all sampling times used. The largest total utilization is mapped here. The
sampling time with the largest total utilization is displayed in r9979.
Total utilization:
Computing time load of sampling time involved including load from higher-priority sampling times (interrupts).
r9979

Sampling time with largest total utilization / t_sampl lg total

CU_G130_DP,
Can be changed: -
CU_G130_PN,
Data type: FloatingPoint32
CU_G150_DP,
P-Group: -
CU_G150_PN
Not for motor type: -
Min
- [µs]
Description:
Displays the sampling time with the largest total utilization.
Dependency:
Refer to: r7901, r9976
Note:
The largest total utilization is displayed in r9976[5].
Total utilization:
Computing time load of sampling time involved including load from higher-priority sampling times (interrupts).
r9980[0...165]

Sampling times utilization calculated / t_sampl util calc

CU_G130_DP,
Can be changed: -
CU_G130_PN,
Data type: FloatingPoint32
CU_G150_DP,
P-Group: -
CU_G150_PN
Not for motor type: -
Min
- [%]
Description:
Displays the calculated utilizations for the active sampling times based on the existing target topology.
Index:
[0] = Net utilization 0
[1] = Total utilization 0
[2] = Net utilization 1
[3] = Total utilization 1
[4] = Net utilization 2
[5] = Total utilization 2
[6] = Net utilization 3
[7] = Total utilization 3
[8] = Net utilization 4
[9] = Total utilization 4
[10] = Net utilization 5
[11] = Total utilization 5
[12] = Net utilization 6
[13] = Total utilization 6
[14] = Net utilization 7
[15] = Total utilization 7
[16] = Net utilization 8
[17] = Total utilization 8
[18] = Net utilization 9
[19] = Total utilization 9
[20] = Net utilization 10
[21] = Total utilization 10
[22] = Net utilization 11
[23] = Total utilization 11
[24] = Net utilization 12
[25] = Total utilization 12
[26] = Net utilization 13
[27] = Total utilization 13
[28] = Net utilization 14
[29] = Total utilization 14
960
Calculated: -
Dyn. index: -
Units group: -
Scaling: -
Max
- [µs]
Calculated: -
Dyn. index: -
Units group: -
Scaling: -
Max
- [%]
List Manual (LH2), 04/2014, A5E03263479A
Access level: 3
Func. diagram: -
Unit selection: -
Expert list: 1
Factory setting
- [µs]
Access level: 4
Func. diagram: -
Unit selection: -
Expert list: 1
Factory setting
- [%]
SINAMICS G130/G150

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g130

Table of Contents