Second Step; Connection With External Equipment; Remote Control; Ethernet - Epson RC620 Safety And Installation

G / rs / c3 / s5 / x5 series, robot controller
Hide thumbs Also See for RC620:
Table of Contents

Advertisement

4. Second Step

Setup other necessary functions after operating the robot system as indicated in 3.
First Step.
Manuals that indicate necessary setups and procedures are guided in this section.
(For descriptions of each manual, refer to 6. Manuals.)

4.1 Connection with External Equipment

4.1.1 Remote Control

EPSON RC+ 6.0 User's Guide
11. Remote Control
ROBOT CONTROLLER RC620 manual
Setup & Operation 10. I/O Remote Set Up
I/O
EPSON RC+ 6.0 User's Guide
ROBOT CONTROLLER RC620
Fieldbus I/O (Option)
ROBOT CONTROLLER RC620 Option Fieldbus I/O

4.1.2 Ethernet

ROBOT CONTROLLER RC620
Setup & Operation 6. LAN (Ethernet) Port

4.1.3 RS-232C (Option)

EPSON RC+ 6.0 User's Guide
12. RS-232C Communication
ROBOT CONTROLLER RC620
Setup & Operation 11.4 RS-232C Board
Safety and Installation (RC620 / EPSON RC+ 6.0) Rev.12
10. I/O Setup
Setup & Operation 9. I/O Connector
Setup & Operation 11.2 Expansion I/O Board (Option)
4. Second Step
189

Advertisement

Table of Contents
loading

This manual is also suitable for:

G seriesRs seriesC3 seriesS seriesX5

Table of Contents