Carrying Out Hole Measurement - Mitsubishi Electric 700 Series Training Manual

Hide thumbs Also See for 700 Series:
Table of Contents

Advertisement

3. Setup Screen

3.7.2 Carrying Out Hole Measurement

Outline
When carrying out hole measurement, three positions (A, B, and C) are measured, and the hole center
position calculated from the three measured positions is set in the workpiece coordinate system offset. The
measurement position displays at the measurement counter.
<Measurement using the touch sensor>
Measurement counter X = X axis skip position
Measurement counter Y = Y axis skip position
<Simple measurement (measurement without using touch sensor)>
Measurement counter X = X axis machine position + center compensation (H) + skip past amount
Measurement counter Y = Y axis machine position + center compensation (V) + skip past amount
(Note) The skip past amount is added for only the axis that moved last.
The sign ( + or - ) of the past amount depends on the movement direction of the axis.
Center compensation (H)
Center compensation (V)
Skip past amount (horizontal axis)
Skip past amount (vertical axis)
(Horizontal axis) (Note)
(Vertical axis) (Note)
Item
"#8703 OFFSET X"
"#8704 OFFSET Y"
"#8707 Skip past amout (H)"
"#8708 Skip past amout (V)"
3.7 Workpiece Measurement
Reference
136

Advertisement

Table of Contents
loading

This manual is also suitable for:

70 series

Table of Contents