Step 3 Set eLight parameters.
1.
2.
3.
Issue 02 (2020-09-07)
Path
Click Test Connect to check whether the eLight Actuator connects properly.
If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
If the connection fails, check whether the cable is properly connected to
the device, whether the device is running properly, and whether the
parameter settings are consistent with the device parameters.
Log in to the ECC800-Pro WebUI as an administrator.
Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The
Running Parameters page is displayed.
Select the Associated alarm severity as required and click Submit.
Table 5-11 Function check
Item
Associated
alarm severity
Copyright © Huawei Technologies Co., Ltd.
Parameter
Connect To
Communicati
ons Port
Device
Address
Alarm Severity
Selection
Critical
Critical, Major
Critical, Major,
Minor
5 Power-On Commissioning
Setting
Select ETH Actuator1 from the
drop-down list box.
NOTE
The setting example indicates that
the eLight Actuator is connected
to the ETH Actuator1.
COM1/COM2
Set the device address for the
eLight actuator based on the
actual situation.
Description
If there is a critical alarm, the
eLight strip light turns on with a
red light.
If there are multiple alarms, the
eLight strip light preferentially
turns on with a light
corresponding to the high-
severity alarm. After the high-
severity alarm is cleared, the
eLight strip light turns on with a
light corresponding to the low-
severity alarm.