Huawei ECC800-Pro User Manual page 310

Data center controller
Hide thumbs Also See for ECC800-Pro:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Context
Procedure
Step 1 Set smoke sensor parameters.
1.
2.
3.
4.
5.
6.
7.
8.
Step 2 Check the monitoring functions of smoke sensor.
Issue 02 (2020-09-07)
Wire of the Network Cable
None (reserved; no connection
needed and to be insulated)
Connecting Cables to the Smoke Sensor:
One end of the network cable has been stripped, core wires 1 (orange-white),
5 (white-blue) and 8 (brown) have been short-circuited, core wires 6 (green)
and 7 (brown-white) have been connected to the cable delivered with the
smoke sensor, and the other end of the network cable has been connected to
the AI/DI port on the ECC800-Pro.
If the sensor is prefabricated, only check its settings.
The actual value prevails. Only the method of the parameter settings is
described.
NO TE
In this example, the smoke sensor is connected to the AI/DI_2 port on the ECC800-Pro.
Log in to the ECC800-Pro WebUI as an administrator.
Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
Set Device type to ECC800, set Device name to ECC800, and click OK.
On the query result tab page, set the new signal name of AI/DI_2 to Smoke
and click Submit.
Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
Set Smoke sensor to Enable and click Submit.
Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
Copyright © Huawei Technologies Co., Ltd.
Smoke Sensor Cable
Normally open end (blue)