ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Step 2 Add a UPS2000G-A.
1.
2.
Issue 02 (2020-09-07)
Table 8-1 Setting a device address
Devic
Toggl
Toggl
e
e
e
Addre
Switc
Switc
ss
h 1
h 2
1
ON
OFF
2
OFF
ON
3
ON
ON
4
OFF
OFF
Set monitoring parameters for UPS2000G-A-(6 kVA–20 kVA).
NO TE
Operate the DIP switch S2 on the optional Modbus card to set the UPS2000G-A device
address. Toggle switches 1 to 8 of DIP switch S2 specify the device address in binary mode.
ON indicates 0, and OFF indicates 1.
Table 8-2 Setting a device address
Devic
Toggl
Toggl
e
e
e
Addre
Switc
Switc
ss
h 1
h 2
1
OFF
ON
2
ON
OFF
3
OFF
OFF
4
ON
ON
Log in to the ECC800-Pro WebUI as an administrator.
Add a UPS2000G-A.
Table 8-3 Adding a UPS2000G-A
Path
Parameter
Choose
Device
System
attribute
Settings >
Device Type
Device
Management
and click Add
Connect To
Device. The
parameters
Copyright © Huawei Technologies Co., Ltd.
Toggl
Toggl
Toggl
e
e
e
Switc
Switc
Switc
h 3
h 4
h 5
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
Toggl
Toggl
Toggl
e
e
e
Switc
Switc
Switc
h 3
h 4
h 5
ON
ON
ON
ON
ON
ON
ON
ON
ON
OFF
ON
ON
Setting
Select UPS from the drop-down list box.
Select UPS2000G-A from the drop-down
list box.
Select ECC800 from the drop-down list
box.
8 FAQ
Toggl
Toggl
Toggl
e
e
e
Switc
Switc
Switc
h 6
h 7
h 8
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Toggl
Toggl
Toggl
e
e
e
Switc
Switc
Switc
h 6
h 7
h 8
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
263

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents