Table 8-14 PDU2000 basic Information
Vendor
Clever
Haipengxin
a: The barcode starts with 21 and is attached to the device.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
Issue 02 (2020-09-07)
Set the PDU2000-M (C) monitoring parameters.
NO TE
The display of a single-phase module is used as an example.
After the PDU2000-M (C) is powered on, the LCM displays the
initialization screen.
Figure 8-13 PDU2000-M (C) initialization screen
Press MENU to enter the device communications address screen.
Figure 8-14 PDU2000-M (C) communications settings
Set address to 1 by pressing DOWN and UP.
Copyright © Huawei Technologies Co., Ltd.
Name
Eleventh and Twelfth
Displayed on
Characters in Device
the WebUI
Barcode
PDU2000-M(C)
FT
PDU2000-M(H)
6B
8 FAQ
a
279