ECC800 Data Center Controller
User Manual (for ECC800-Pro)
5.
6.
Step 4 Create a user.
When connecting to the VCN on the NetEco, you need to log in to the VCN as a
non-admin user.
1.
2.
3.
4.
----End

6.6 Linkage Control

Issue 02 (2020-09-07)
NO TE
If you set the recording plan policy is to All, you do not need to set the recording plan
time.
Click Next to complete the recording plan setting. When
status bar, the recording plan has been set successfully.
Click Finish.
Log in to the VCN IVS as user admin.
On the VCN IVS home page, double-click Add User, create a user, and click
Next. The Assign Rights page is displayed.
NO TE
When creating a user, you can select Enable account validity period and set Valid from
and Valid to to set the account validity period for the created user.
Figure 6-56 Creating a user
Set Multi-point logins to a value greater than 2.
In the Assign Device View Rights area, select the cameras to be browsed and
queried by the user. Set other parameters based on the documentation
delivered with the equipment or the documentation obtained by referring to
the Preparing Documentation section, and click Finish.