Data center controller
Hide thumbs Also See for ECC800-Pro:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Figure 6-64 Total power consumption configuration
2.
On the IT Cabinet Power Consumption Configuration tab page, click Add to
enter the IT Cabinet Power Consumption Configuration page. On the
Select Device tab page, select Integrated PDU 1 and on the Select
Indicators tab page, select 1QF4 electricity energy, 1QF5 electricity energy,
and 1QF6 electricity energy, and click Confirm.
Figure 6-65 IT cabinet power consumption configuration
3.
Under Total Power Consumption Configuration and IT Cabinet Power
Consumption Configuration, click the edit icon on the right to modify the
multiple for calculating indicators, as shown in
Issue 02 (2020-09-07)
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
Figure
6-66.
209