Commissioning The Elight (For Fusionmodule800) - Huawei ECC800-Pro User Manual

Data center controller
Hide thumbs Also See for ECC800-Pro:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)

5.7 Commissioning the eLight (for FusionModule800)

When the system type is FusionModule800 an eLight is installed, perform the
following steps to configure it.
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Table 5-9 Setting a device address
Address
1
2
3
4
Step 2 Add an eLight.
1.
2.
Issue 02 (2020-09-07)
Item
NOTE
After you set the alarm severity, the eLight indicator is off if no alarm is generated.
Toggle
Switch 1
ON
OFF
ON
OFF
Log in to the ECC800-Pro WebUI as an administrator.
Add an eLight.
Table 5-10 Adding an eLight
Path
Choose System
Settings > Device
Management and click
Add Device. The
parameters for adding
devices are displayed.
Copyright © Huawei Technologies Co., Ltd.
Alarm Severity
Selection
None
Toggle
Switch 2
OFF
ON
ON
OFF
Parameter
Device
attribute
Device Type
5 Power-On Commissioning
Description
The eLight strip light is steady
blue (atmosphere light).
Toggle
Toggle
Switch 3
Switch 4
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
Setting
Select eLight Actuator from the
drop-down list box.
Select eLight Actuator from the
drop-down list box.
118

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents