Download Print this page

Toshiba GR200 Series Instruction Manual page 807

Hide thumbs Also See for GR200 Series:

Advertisement

Select logic for SBO/DIR modes
4.9.1
The user should set scheme switch [TPOS01-CTREN] to On prior to TPOS01 operation. Table
4.9-11 shows all of the scheme switches in the TPOS function.
Receiving "select command P1-control" from the remote-end
(i)
Figure 4.9-2 outlines the reception of the select command 'P1-control' from the remote-end.
Wait for a command
Select stage
P1 control from the remote-end
Signal reception
IEC61850
P2 control from the remote-end
P3 control from the remote-end
P1 control from the local-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3 control by the PLC function
Figure 4.9-2 Outline of select command 'P1-control'
Input point required mapping
Figure 4.9-3 shows the select logic when a "Selection command (Remote-P1-Control)" signal is
applied to the TPOS01 function. This logic has the input-point "DEV01_CONTROL_REQ" for
the reception of a select command; the input-point should be mapped for IEC 61850
communication. The function will fail to operate if mapping is not performed correctly. We will
discuss how to map the input-points for IEC 61850 communication in section 4.9.7.
Failed
Select
Selection logic
decision
- 786 -
Signal output
Success
6F2S1915 (0.46)
Wait for a next command
Cancel logic
Cancel command
Cancel logic
Operate logic
Operate command
Operate logic
GRZ200 (Soft 031 & 032)

Advertisement

loading

This manual is also suitable for:

Grz200