Wait for a command
Select stage
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote-end
P1 control from the local-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3control by the PLC function
PLC logic programmed
by the user
Figure 4.9-18 Outline of select command 'P3-control'
Input signal from the PLC function
Figure 4.9-9 shows the select logic when a "Select command P3-Control (PLC-P3-Control)"
signal is generated by the PLC function. There are two input points for the reception of this
signal, like in the "Select Command P1-Control (PLC-P1-Contol)" signal. That is, if interlock
checking is required, use the connection point (PLC#1; e.g., DEV01_P3_INTERLOCK).
Alternatively, if the interlock check is not required, use the connection point (PLC#2; e.g.,
DEV01_P3_COMMAND). PLC#1 and PLC#2 are shown in Table 4.9-4.
Failed
Select
Selection logic
decision
- 800 -
Signal output
Success
6F2S1915 (0.46)
Wait for a command
Cancel logic
Cancel command
Cancel logic
Operate logic
Operate command
Operate logic
GRZ200 (Soft 031 & 032)