Download Print this page

Toshiba GR-200-5 Instruction Manual page 752

Multi functional protection ied

Advertisement

Start and stop of measuring the fault duration time is processed by the logic illustrated in
Figure 8.1-1. Measuring is started and stopped by the generation of PLC connecting points
[FDT_PU_Trig] and [FDT_DO_Trig]. The "GEN TRIP" signal is assigned to [FDT_DO_Trig] as
default, and no default signal is assigned to [FDT_PU_Trig]. For this reason, in order to
measure and record the fault duration time, the user must assign any relay operation signal
to [FDT_PU_Trig], according to application of IED.
Furthermore, in consideration of the case where [FDT_PU_Trig] has been generated and
measurement has been started but [FDT_DO_Trig] is not being generated, forcibly stop to
measure is made possible. After generating of [FDT_PU_Trig], when the settling time
[F.Durat_Time] time is elapsed, the measurement is forcibly stopped.
800001EBB0
GEN.TRIP
800001EBB1
Figure 8.1-2 Start and stop of measuring the fault duration time
FDT_PU_Trig
FDT_DO_Trig
F/F
- 732 -
Start to measure
Stop to measure
≥1
F.Durat_Time
t 0
0.01-300.00s
6F2T0207 (0.01)
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6