Download Print this page

Toshiba GR-200-5 Instruction Manual page 522

Multi functional protection ied

Advertisement

operations performed by the logic. When the user sets Off for scheme switch
[SCDEN], the operation of the logic is blocked if the logic is running in the same
operation-direction compared with the previous operation-direction (i.e., when on
(off) is performed sequentially). On the other hand, if On is set for the scheme
switch, the logic is not blocked.
Note: The user will need to program the PLC logic "Control hierarchy condition". The
8
user is also required to connect the logic condition with the select condition logic
using the connection point "DPOS01IN_TMP_28". For more information, see
Control and monitoring application: Control hierarchy
Chapter
PLC#3 of Table 4.2-6.
Note: To identify the input point of the other DPOS, see Table 4.2-6 for PLC#1 and
9
PLC#2.
- 502 -
6F2T0207 (0.01)
(→p. 362). See
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6