Installing The Cabinet On An Esd Floor - Huawei FusionModule500 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
4.
----End

2.2.3.2 Installing the Cabinet on an ESD Floor

Context
A support is required when the cabinet is installed on an ESD floor. The support height
depends on the height between the ground and the ESD floor.
Procedure
Step 1 Lift the cabinet onto the support and align the mounting holes on the cabinet with those on the
support.
Step 2 Level the cabinet by adjusting the anchor bolts and using a level, as shown in
Step 3 Insert four M12 bolt assemblies into the mounting holes for the PDC and support. Tighten the
bolts, as shown in
Issue 07 (2019-12-20)
Figure 2-9 Combining cabinets
Install other cabinets at a time in the same way.
Figure
2-10.
Copyright © Huawei Technologies Co., Ltd.
2 Installation
Figure
2-10.
31

Advertisement

Table of Contents
loading

Table of Contents