Optional) Connecting A Monitoring Cable To The Independent Deployment Ai/Di Unit; Optional) Connecting Cables To A Cim - Huawei FusionModule500 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
Step 3 Connect one end of the power cable to the power input port (as shown by (4) in
on the power module and the other end to the PDU2000 in the cabinet.
----End
2.3.3.7 (Optional) Connecting a Monitoring Cable to the Independent
Deployment AI/DI Unit
Prerequisites
The independent deployment AI/DI unit has been installed.
Procedure
Step 1 Use a network cable to connect the COM_IN port on the independent deployment AI/DI unit
to the COM3/12V port on the ECC800e.
----End

2.3.3.8 (Optional) Connecting Cables to a CIM

Context
In the scenario with two battery cabinets, each battery cabinet is configured with a CIM and a
Hall effect sensor. The following steps describe how to connect a CIM to a battery cabinet.
Procedure
Step 1 Connect the cable between the CIM and the Hall effect sensor. The Hall effect sensors of the
battery string respectively connect to the HALL_1 and HALL_2 current monitoring ports on
the CIM.
HALL_1 port on the CIM.
The cable direction of the positive battery string (connected from the UPS to the batteries)
must be the same as the current arrow direction.
Issue 07 (2019-12-20)
The figure uses the VCN500 as an example.
After connecting the power cable, turn on the power switch on the panel to start the device.
Figure 2-91
shows the cable connection between one Hall effect sensor and the
Copyright © Huawei Technologies Co., Ltd.
2 Installation
Figure
2-90)
96