Step 2 Set the toggle switch 2 on the T/H sensor to on.
Figure 2-64 Setting the DIP switch on a T/H sensor
----End

2.2.7.16 (Optional) Installing BIMs and CIMs

Context
Figure 2-65
Figure 2-65 Installation position of the CIM in the battery cabinet
(1) Hall effect sensor
Issue 07 (2019-12-20)
shows the installation position of the CIM in the battery cabinet.
(2) CIM
Copyright © Huawei Technologies Co., Ltd.
(3) Battery control I/O board (BIB)