FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
About This Document .................................................................................................................... ii
1 Safety Information ........................................................................................................................ 1
1.1 General Safety .............................................................................................................................................................. 1
1.2 Personnel Requirements ............................................................................................................................................... 4
1.3 Electrical Safety ............................................................................................................................................................ 4
1.4 Installation Environment Requirements ....................................................................................................................... 6
1.5 Mechanical Safety ........................................................................................................................................................ 7
1.6 Cooling System Safety ............................................................................................................................................... 10
1.7 Battery Safety ............................................................................................................................................................. 11
1.8 Others.......................................................................................................................................................................... 13
2 Installation.................................................................................................................................... 14
2.1 Installation Preparations ............................................................................................................................................. 14
2.1.1 Tools and Instruments .............................................................................................................................................. 14
2.1.2 Checking Environment Before Installation.............................................................................................................. 15
2.1.3 Site Equipment Preparation ..................................................................................................................................... 17
2.1.4 Personnel Requirements .......................................................................................................................................... 18
2.2 Installing Components ................................................................................................................................................ 19
2.2.1 Installation Scenario (Single-Phase 220 V Power System)...................................................................................... 19
2.2.2 Installation Scenario (Dual-Live Wire 208 V Power System) ................................................................................. 24
2.2.3 Installing the Cabinet (with no Antiseismic Kit) ..................................................................................................... 27
2.2.3.1 Installing the Cabinet on a Concrete Floor ........................................................................................................... 27
2.2.3.2 Installing the Cabinet on an ESD Floor ................................................................................................................ 31
2.2.4 Installing the Cabinet (with an Antiseismic Kit) ...................................................................................................... 34
2.2.5 (Optional) Installing a Battery Pack ........................................................................................................................ 43
2.2.6 Installing an rPDU ................................................................................................................................................... 45
2.2.6.1 Installing the rPDU Horizontally .......................................................................................................................... 45
2.2.6.2 (Optional) Installing a Full-Height rPDU Vertically ............................................................................................. 46
2.2.6.3 (Optional) Installing a Half-Height rPDU Vertically ............................................................................................ 47
2.2.7 Installing Monitoring Devices ................................................................................................................................. 48
2.2.7.1 Equipment Layout in the 42 U Cabinet ................................................................................................................ 48
2.2.7.2 Installing a Water Sensor ...................................................................................................................................... 49
2.2.7.3 (Optional) Installing a Camera .............................................................................................................................. 49
Issue 07 (2019-12-20)