3.
Step 2 Install the CIM, as shown in
The CIM must be installed 1 meter above the ground to ensure proper wireless
communication between the CIM and the BIM.
Figure 2-70 Fastener position
(1) CIM fixed mount
1.
2.
Issue 07 (2019-12-20)
After connecting all power cables to the system, connect the cable to the BIM.
Figure 2-69 Connecting a BIM
Connect the antenna delivered with the CIM to the RF_Z port on the CIM.
Strip the adhesive tape from the CIM fastener, and attach the fastener to the bounding
frame on the CIM fixed mount.
Copyright © Huawei Technologies Co., Ltd.
Figure 2-70
and
Figure
(2) Bounding frame
2-71.
(3) Fastener