4.1 O&M Precautions

4.2 Routine Maintenance

Monthly preventive maintenance table
Table 4-1 Monthly preventive maintenance table
Maintenance area
Power Distribution
System
Issue 07 (2019-12-20)
When performing high-voltage and AC operations, use dedicated tools and wear
protective equipment.
Before replacing a component which is not hot swappable, you must switch off the
upstream circuit breaker or fuse, and verify that the component to be replaced is powered
off.
Assess impact on the system before switching off the general input circuit breaker or
turning off the cooling system during parts replacement.
Do not install or remove power cables for a device which is powered on. Transient
contact between the core of the power cable and the conductor may generate electric arcs
or sparks, which may cause fire or hurt human eyes.
Before removing component cables, mark the cables with their corresponding port
numbers for later connection.
Powering off the system will interrupt services. Obtain the customer's consent before
powering off the system.
Item
Surge protection
module
Copyright © Huawei Technologies Co., Ltd.
4
Operation
Check the surge
protection module
indicator and
miniature circuit
breaker (MCB)
status.

Maintenance

Expected
Troubleshooting
Result
The surge
protection
module
indicator is
steady green.
The MCB is
ON.
4 Maintenance
If the surge
protection
module indicator
is steady red,
replace the surge
protection
module.
If the MCB is
127