Huawei FusionModule500 User Manual page 82

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
Use an insulated torque wrench during battery installation. The terminal torque depends on
battery specifications.
M6: 4–6 N· m.
M8: 13–15 N· m.
M10: 15–20 N· m
(1) Bolt
(4) OT terminal
2.
(1) Strip the adhesive tape from the BIM
fastener.
Issue 07 (2019-12-20)
Figure 2-67 Connecting battery cables
Install a battery bolt in the following sequence: bolt > spring washer > flat washer > OT terminal >
battery connecting piece.
Secure the BIM.
Figure 2-68 Securing a BIM
Copyright © Huawei Technologies Co., Ltd.
(2) Spring washer
(5) Battery connecting piece
(2) Attach the BIM and press it for more than
10 seconds.
2 Installation
(3) Flat washer
73