ABB Relion 670 Series Applications Manual page 274

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 10
Unbalance protection
L3
L2
L1
Su = 1
Blown
fuses
IEC19000929 V1 EN-US
Figure 129: Units arrangement in an ungrounded double WYE connected capacitor bank
The per unit capacitance of the parallel group of capacitors that include the blown fuses is
calculated as,
P
=
a
C
g
P
IECEQUATION19337 V1 EN-US
Where,
P
is the number of parallel units in the affected section = 9.
a
n is the number of blown fuses.
The per unit phase-to-neutral capacitance of the series or parallel group of capacitor units that
include blown fuses is calculated as,
=
C
s
C
IECEQUATION19338 V1 EN-US
Where, S
The per-unit capacitance of the phase (both WYEs) that includes blown fuses is calculated as,
(
=
C
p
IECEQUATION19339 V1 EN-US
Where,
P
is the number of parallel units per phase = 15.
u
For a single WYE bank, P
Because of the element failure in the left section, per unit (of line-to-ground voltage)
unbalance voltage in the neutral is calculated as,
=
V
NG
2
IECEQUATION19340 V1 EN-US
268
Cu
N1
Pa = 9
-
n
a
´
S
C
u
g
(
)
´
-
+
S
1
1
g
u
is number of series groups = 1.
u
)
´
+
-
P
C
P
P
a
s
u
a
P
u
= P
and C
a
u
3
-
1
+
C
p
© Copyright 2017 Hitachi Power Grids. All rights reserved
Cu
Cu
= C
.
p
s
1MRK 511 401-UEN Rev. K
Cu
Cu
N2
IEC19000929-1-en.vsdx
(Equation 151)
(Equation 152)
(Equation 153)
(Equation 154)
Bay control REC670
Application manual