ABB Relion 670 Series Applications Manual page 383

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 401-UEN Rev. K
QB12OPTR (bay 1/sect.2)
QB12OPTR (bay n/sect.2)
QB12OPTR (bay 1/sect.1)
QB12OPTR (bay n /sect.1)
VPQB12TR (bay 1/sect.2)
VPQB12TR (bay n/sect.1)
VPQB12TR (bay 1/sect.1)
VPQB12TR (bay n/sect.1)
EXDU_12(bay 1/sect.2)
EXDU_12 (bay n /sect.2)
EXDU_12 (bay 1/sect.1)
EXDU_12 (bay n /sect.1)
IEC04000491 V1 EN-US
Figure 179: Signals from any bays for a bus-section circuit breaker between sections B1
15.4.5.3
Configuration setting
If there is no other busbar via the busbar loops that are possible, then either the interlocking
for the QA1 open circuit breaker is not used or the state for BBTR is set to open. That is, no
busbar transfer is in progress in this bus-section:
BBTR_OP = 1
VP_BBTR = 1
15.4.6
Interlocking for bus-section disconnector A1A2_DC
Bay control REC670
Application manual
S1S2OPTR (A1A2)
BC12OPTR (sect.1)
. . .
. . .
S1S2OPTR (A1A2)
BC12OPTR (sect.2)
. . .
. . .
VPS1S2TR (A1A2)
VPBC12TR (sect.1)
. . .
. . .
VPBC12TR (sect.2)
. . .
. . .
EXDU_BS (A1A2)
EXDU_BC (sect.1)
. . .
. . .
EXDU_BC (sect.2)
. . .
. . .
and B2
© Copyright 2017 Hitachi Power Grids. All rights reserved
>1
&
&
BBTR_OP
>1
&
&
VP_BBTR
&
EXDU_12
en04000491.vsd
Section 15
Control
M15111-57 v3
IP14159-1 v2
377

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents