ABB Relion 670 Series Applications Manual page 409

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 401-UEN Rev. K
interbay communication on the IEC 61850 communication protocol. Complete exchange of
TR8ATCC data, analog as well as binary, via GOOSE is made cyclically every 300 ms.
The busbar voltage U
associated TR8ATCC function. These measured values will then be exchanged between the
transformers, and in each TR8ATCC block, the mean value of all U
The resulting value U
regulation, thus assuring that the same value is used by all TR8ATCC functions, and thereby
avoiding that one erroneous measurement in one transformer could upset the voltage
regulation. At the same time, supervision of the VT mismatch is also performed. This works
such that, if a measured voltage U
parameter
alarm signal VTALARM will be generated.
The calculated mean busbar voltage U
BusVolt under Main menu/Test/Function status/Control/
TransformerVoltageControl(ATCC,90)/TR8ATCC:x.
Measured current values for the individual transformers must be communicated between the
participating TR8ATCC functions, in order to calculate the circulating current.
The calculated circulating current I
ICIRCUL under Main menu/Test/Function status/Control/
TransformerVoltageControl(ATCC,90)/TR8ATCC:x.
When the circulating current is known, it is possible to calculate a no-load voltage for each
transformer in the parallel group. To do that the magnitude of the circulating current in each
bay, is first converted to a voltage deviation, U
=
U
C
di
EQUATION1869 V1 EN-US
where X
Comp which serves the purpose of alternatively increasing or decreasing the impact of the
circulating current in TR8ATCC control calculations. It should be noted that U
positive values for transformers that produce circulating currents and negative values for
transformers that receive circulating currents.
Now the magnitude of the no-load voltage for each transformer can be approximated with:
=
U
U
i
EQUATION1870 V1 EN-US
This value for the no-load voltage is then simply put into the voltage control function for single
transformer. There it is treated as the measured busbar voltage, and further control actions
are taken as described previously in section
transformer". By doing this, the overall control strategy can be summarized as follows.
For the transformer producing/receiving the circulating current, the calculated no-load
voltage will be greater/smaller than the measured voltage U
voltage will then be compared with the set voltage
the outer deadband will result in ULOWER or URAISE being initiated alternatively. In this way
the overall control action will always be correct since the position of a tap changer is directly
proportional to the transformer no-load voltage. The sequence resets when U
the inner deadband at the same time as the calculated no-load voltages for all transformers in
the parallel group are inside the outer deadband.
Bay control REC670
Application manual
is measured individually for each transformer in the parallel group by its
B
will then be used in each IED instead of U
Bmean
VTmismatch ) and for more than a pre set time (setting parameter tVTmismatch ) an
´
´
I
X
i
cc i
_
i
is the short-circuit reactance for transformer i and C
i
+
U
Bmean
di
© Copyright 2017 Hitachi Power Grids. All rights reserved
, differs from U
with more than a preset value (setting
B
Bmean
is shown on the local HMI as a service value
Bmean
for transformer "i" is shown on the HMI as a service value
cc_i
, with equation 188:
di
"Automatic voltage control for a single
USet . A steady deviation which is outside
values will be calculated.
B
for the voltage
B
(Equation 188)
, is a setting parameter named
i
will have
di
(Equation 189)
. The calculated no-load
Bmean
is inside
Bmean
Section 15
Control
403