Test Lead Connections For Open Correction - HP 4062UX Installation Manual

Semiconductor process control system semiconductor parametric test system
Table of Contents

Advertisement

d
c
Figure 6-7. An Example of Calibration Data Entry Page: HP 16346C
5. After entering the necessary calibration data, select the
calibration module menu page to return to the startup page.
6. If your HP 4062UX system is equipped with a CMU84, perform the OPEN and SHORT
corrections of the CMU84. To do so, select the
displayed prompts. It takes about three minutes for the corrections.
For OPEN correction, disconnect the BNC-BNC cables from the SWM and remove the
BNC-BNC cables and BNC f-to-f adapters as shown in Figure 6-8.
Figure 6-8. Test Lead Connections for OPEN Correction
For SHORT correction, interconnect the BNC-T adapters with a BNC f-to-f adapter as
shown Figure 6-9.
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Start-up Menu
softkey and follow the
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
HP4284A Corr.
System Verification 6-11
a
b
softkey on the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp 4062f

Table of Contents