FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 1-3 Smart module height
Cabinet height L1: 2000 mm
Smart Module Layout Requirement
Figure 1-4 Smart module layout requirement
1.5 Documents
Before installation, prepare the following documents in addition to this document.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Open-skylight height L2: 550 mm
1 Installation Preparations
6