Figure 3-30 Securing the tail frame accessories
Step 2 Use four M5 tapping screws to secure one upper sealing plate to the tail frame, as shown in
Figure 3-32.
There are two upper sealing plates, and the one used in this step has a gap. Figure 3-31 shows
the upper sealing plates of a tail frame.
Figure 3-31 Upper sealing plates of a tail frame