Huawei FusionModule2000 Installation Manual page 156

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 7-38 Installing the magnet
(1) White rubber washer
Step 7 (Optional) Adjust the magnet.
If the magnet does not work properly after power-on, check that:
1.
2.
3.
If any of the preceding conditions is not met, the magnetic lock fails to attract the magnet.
Troubleshoot the magnet as follows:
1.
2.
3.
4.
Issue 04 (2017-06-30)
The magnet provides magnetic force by attaching magnetizable iron parts to it.
The revolving door magnetic lock is aligned with the magnet face-to-face.
No gap exists between the revolving door magnetic lock and the magnet.
Check the circuit and rectify any circuit fault.
Adjust the magnet base and the door panel to align the magnetic lock with the magnet
face-to-face. Ensure that the deviation is minimum.
If a gap exists between the revolving door magnetic lock and the magnet, rectify the fault
as shown by (1) in Figure 7-39.
If the magnet is not level, rectify the fault as shown by (2) in Figure 7-39 to adjust the
magnet levelness.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
147

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents