Installing Fixed-Size Bases; Deploying A 300 Mm Wide Air Conditioner Base - Huawei FusionModule2000 Installation Manual

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
----End
Result
After securing bases, ensure that adjacent bases are in close contact with each other and the
gap is even.

3.8.3 Installing Fixed-Size Bases

3.8.3.1 Deploying a 300 mm Wide Air Conditioner Base

Context
A 300 mm wide air conditioner base is used for a 300 mm wide air conditioner. The BOM
number is 21152146.
Figure 3-52 300 mm wide air conditioner base
When deploying the base, place the side marked FRONT facing the aisle containment.
Procedure
Step 1 (Optional) Adjust the adjustable feet of the base.
Move the adjustable feet of the air conditioner base to the cabinet front (close to the front door
of the cabinet).
1.
Issue 04 (2017-06-30)
Remove the four M6 screws from adjustable feet and set them aside.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents