Step 2 Assemble the base.
1.
2.
3.
----End
Issue 04 (2017-06-30)
Figure 3-44 Tightening height locking bolts
Adjust the base depth based on the cabinet depth.
Tighten the bolt assembly on the telescopic rod.
Figure 3-45 Assembling a base
Assemble the telescopic rod and the base, and then tighten the bolt assembly.