FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Cabinet Installation Checklist
No.
1
2
3
4
5
6
7
8
9
Aisle Containment Checklist
No.
1
Issue 04 (2017-06-30)
C
Check That
The cabinets are placed according to the equipment room
layout diagram.
The height deviation of all cabinets and the depth
deviation of adjacent cabinets are less than 5 mm.
All bolts are tightened, especially the bolts used for
electric connection. Flat washers and spring washers are
installed properly.
The cabinet is clean and complies with dustproof
requirements.
The paint on the cabinet exterior is intact. If paint flakes
off, repaint that area to avoid corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
There is no foreign matter such as adhesive tape, cable
ties, paper, or packing materials left around the cabinet.
The cabinet filler panels are in proper positions so that
the cold aisle and hot aisle are isolated.
Check Item
All components of the aisle containment are installed.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installation Verification

C Installation Verification

Check Result
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
Check Result
□ Compliant □
Incompliant