Huawei FusionModule2000 Installation Manual page 223

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure A-9 Column in a row of cabinets (A ≥ 70 mm)
Issue 04 (2017-06-30)
Seal both sides of the column using sealing plates. Directions of the concave sides of the sealing
plates are shown in Figure A-9.
Install cable trays over the cabinets on both sides of the blank cabinet place. If the cable trays cannot
be installed in combined mode, install them in layered mode, the upper for routing weak-current
cables while the lower for routing strong-current cables.
Install flat or rotating skylights over the aisle containment.
If sealing plates cannot be installed on both sides of the column, install sealing plates only near the
aisle containment.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix
214

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents