FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Step 4 Route the button cable out of the cable hole in the upper part of the post and then into the
upper frame mounting kit of the end door.
Step 5 Reinstall the side panel for the post, as shown by (4) in Figure 7-40.
----End
7.8.6 Installing the Pad Mounting Kit
The BOM number of the pad mounting kit is 21242016. Install the pad mounting kit on the
end door hanger at the PDC.
Figure 7-41 Pad mounting kit
Table 7-2 Pad mounting kit
No.
1
2
3
Issue 04 (2017-06-30)
Name
Pad mounting kit
Baffle plate with the cable
hole in the lower part
Baffle plate with the cable
hole in the middle
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
Description
Provides the position for installing the pad
and access control.
Used for installing the fingerprint and card
reader or the fingerprint and card reader
with a keypad.
Used for installing the card reader with a
keypad or the IC card reader.
149