Figure 10-6 Cutting off the excess part of a cable tie
Do not use cable ties at a place where the cables are bent. Otherwise, the cable cores may
break due to strong stress, as shown in Figure 10-7.
Figure 10-7 Binding cables in a bending area
Ensure that the cable ties are wrapped and secured in the same direction and do not
generate interference with subsequent operations, as shown in Figure 10-8.