FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Step 6 Secure the door box.
If the door box is evenly and properly placed as shown in Figure 5-24, secure it using M5
screws as shown by (2) in Figure 5-22. If the door box is tilted, adjust it as described in
7.
Figure 5-24 Door boxes in place
Step 7 Adjust the gaps.
After the door boxes are placed, the gaps between the door boxes and the posts may be
uneven and need to be adjusted, as shown in Figure 5-25 and Figure 5-27.
Table 5-3 Door box placement faults
Fault Type
Issue 04 (2017-06-30)
Figure 5-23 Installing the door box
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Possible Cause
5 Installing the Contained Aisles
Measure
Step
107