Huawei FusionModule2000 Installation Manual page 180

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Procedure
Step 1 Connect the water detection cable and conversion cable.
Figure 7-69 Connecting cables
(1) Conversion cable end B, connected to
the water detection cable
Step 2 Connect the other end of the conversion cable to the water detector.
Figure 7-70 Connecting a water detector
----End
Issue 04 (2017-06-30)
The water detection cable and conversion cable are interconnected through the male and female
connectors.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
(2) Water detection cable end A, connected
to the conversion cable
171