Control Management Of The Infrared Remote Control Module; Connecting The Communications Cable - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
1. It is recommended that you perform a battery shallow discharge test only in a class 1
2. After the UPS is powered off, the battery maintenance period of the UPS will be
3. During a battery shallow discharge test, if the mains outage occurs, the backup capacity
Procedure
Step 1 Log in to the ECC800 WebUI as an administrator.
Step 2 Choose System Settings > PLC.
Step 3 Set Enable PLC function to Yes and click Submit.
Step 4 Select 4 in the Logic List area and click Activate. Status then displays green.
Figure 7-2 Activating a battery shallow discharge test
----End
7.6 Control Management of the Infrared Remote Control
Module
In the FusionModule500 scenario, the civil smart cooling product can start automatically if
you enable the infrared remote control module on the ECC.

7.6.1 Connecting the Communications Cable

Procedure
Step 1 Use a communications cable to connect the T/H sensor to the COM2 port on the ECC800e.
Step 2 Use a communications cable to connect the infrared remote control module to the T/H sensor.
----End
Issue 06 (2020-01-02)
power grid scenario after confirming with the customer. If the power grid is not stable, do
not perform the battery shallow discharge test.
recalculated.
may be inconsistent with the rated capacity.
Copyright © Huawei Technologies Co., Ltd.
7 Feature Description
162

Advertisement

Table of Contents
loading

Table of Contents