Figure 3-111 Installing The Chs Large Batt Box Using The Chs2U; Figure 3-112 Removing Chs Large Batt Box Cover; Battery Installation - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
3 - 94
2.
Mark and drill the four holes required to install the CHS BASE
UNIT.
3.
Align bolt holes in CHS BASE UNIT (see
Mount Spacing Guide on page
and secure using four anchor bolts.
4.
Align and install the CHS LARGE BATT BOX on top of the CHS
BASE UNIT.
Figure 3-111 Installing the CHS LARGE BATT BOX using the CHS2U JOINT
BRACKET KIT
5.
Secure the CHS LARGE BATT BOX to the CHS BASE UNIT
using the CHS2U JOINT BRACKET KIT. Refer to
Installing the CHS LARGE BATT BOX using the CHS2U JOINT
BRACKET
8.2.2

Battery Installation

1.
Loosen screw on front of CHS LARGE BATT BOX.

Figure 3-112 Removing CHS LARGE BATT BOX Cover

3-93) with holes drilled in floor
KIT.
UNIVERGE SV8100
Figure 3-110 Floor
Figure 3-111
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents