Expansion (Chs2U E) Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
7.2
System Hardware Manual
6.
Connect the ground wire to all chassis. Refer to
on 19" Chassis on page 3-18
system.
7.
Refer to
3.3.5 Install AC Power Cords on 19" Chassis on page 3-20
continue installation of the chassis or, Chapter 6 paragraph
Installation and Safety Precautions on page 4-4
Rack Mounting the 9.5" Base (CHS2U B-US) and Expansion
(CHS2U E) Chassis
To rack mount the combined Base (CHS2U B-US) and Expansion (CHS2U E)
chassis, the IP3-RACK MOUNT BAR SET is required.
Controlling and Expansion chassis must be installed
vertically for proper air circulation.
7.2.1
CHS2U B-US and CHS2U E Chassis Installation
1.
Attach the metal rack mount brackets to each side of the chassis using
the screws provided (refer to
9.5" Chassis on page
for complete details on grounding the
Figure 3-97 Attach Rack Mount Brackets to
3-84).
Issue 2.0
3.3.3 Install Grounding
to
2.1
for installation of blades.
3 - 83

Advertisement

Table of Contents
loading

Table of Contents