Figure 3-130 Installing Cover Battery; Figure 3-131 Remove Top Cover Of Battery Compartment; Batt Box) On 9.5" Gateway (Chs2U Gw-Us) And Base (Chs2U B-Us) Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
8.3
3 - 104
9.
Insert tabs on cover into holes on CHS LARGE BATT BOX.
Slide the cover left until seated and tighten the screw.
Installing the External Batteries (CHSGW SMALL BATT BOX) on
9.5" Gateway (CHS2U GW-US) and Base (CHS2U B-US) Chassis
An optional, CHSGW SMALL BATT BOX can be installed to provide external
battery power to the CHS2U GW-US and CHS2U B-US chassis during a
power failure. The short-term battery box will power the system for
approximately 10 minutes.
8.3.1
CHSGW SMALL BATT BOX Installation
1.
On the battery box compartment, remove the two screws then
lift and set aside the top cover.

Figure 3-131 Remove Top Cover of Battery Compartment

Figure 3-130 Installing Cover Battery

Installing the SV8100 Chassis
UNIVERGE SV8100

Advertisement

Table of Contents
loading

Table of Contents