Installing The 9.5" Base (Chs2U B-Us) And Expansion; (Chs2U E) Chassis; Figure 3-27 9.5"Base And Expansion (Combined) Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
3.5
Power Switch
3 - 24

Installing the 9.5" Base (CHS2U B-US) and Expansion

(CHS2U E) Chassis

The CHS2U B-US and CHS2U E chassis combined have six universal blade
slots for legacy line/trunk blade (Single Line Telephone Interface, Digital
multiline terminal Interface, Central Office Trunk, ISDN PRI Interface, etc.),
In-skin Application Blades (In-skin UMS, In-Skin Router, etc.). It also houses
the BUS Interface Blade and Power Supply Unit (PSU).
When the CD-CP00-US blade is installed in slot 1 of the 9.5" Base Chassis, it
is called the controlling chassis. Additional chassis, (9.5" Expansion Chassis)
can be installed to increase the capacity of the system to meet the customer's
business needs.
Before proceeding with installation of chassis, ensure site preparation is
completed. The combined chassis can be:
Wall-mounted – refer to
and Expansion (CHS2U E) Chassis on page
Rack-mounted – refer to
and Expansion (CHS2U E) Chassis on page
Base Chassis
CHS2U B-US
PZ-BS10 or
PZ-BS11 Slot
and LED
3 Universal Slots
(One slot for CPU)

Figure 3-27 9.5"Base and Expansion (Combined) Chassis

4.3 Wall Mounting the 9.5" Base (CHS2U B-US)
3-59.
7.2 Rack Mounting the 9.5" Base (CHS2U B-US)
3-83.
Expansion Chassis
3 Universal Slots
Installing the SV8100 Chassis
UNIVERGE SV8100
CHS2U E

Advertisement

Table of Contents
loading

Table of Contents