Figure 11-18 Installing The Ferrite Core On The Ap(A)-R/Ap(R)-R Unit - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
11 - 18
3.
Install the ferrite core (provided with the unit) about two inches
from the line cord plug.
AP(A)-R Unit
or
AP(R)-R Unit

Figure 11-18 Installing the Ferrite Core on the AP(A)-R/AP(R)-R Unit

4.
Connect the line cord to the unit, limiting the cable length from
the AP(A)/AP(R)-R Unit to the single line telephone to a
maximum of 50 feet.
When only installing the AP(R)-R Unit, plug the AC Adapter (AC-2R/
AC-3R Unit) power cord into the indicated AP(R)-R Unit receptacle
and connect it to a power source. Refer to
AC Adapter to an Installed Adapter on page
5.
Replace the base plate (or wall mount unit) and attach the line
cord. Refer to
Section 3 Connecting a Multiline Terminal to the
System on page
10-12.
term
Installing D
Series i Optional Equipment
UNIVERGE SV8100
Figure 11-5 Connecting the
11-5.

Advertisement

Table of Contents
loading

Table of Contents