PTO Switch Installation (T-Bar)
1. Push the PTO switch in to place in the control panel
(Fig. 1439).
Fig 1439
2. Plug the wire harness into the PTO switch (Fig.
1440).
Fig 1440
Floating Deck Mid-Size Service Manual
3. Position the bottom panel to the control panel and
install 2 screws securing it to the control panel (Fig.
1441).
PICT-1811
4. Position the manual tube to the control panel as-
sembly and install 2 screws securing the manual
tube R-clamps to the control panel and bottom panel
(Fig. 1442).
PICT-1793
ELECTRICAL
Fig 1441
PICT-1789
Fig 1442
PICT-1787
9
9-19