Opc Switch Installation (T-2) - Toro 30284 Service Manual

Floating deck mid-size
Hide thumbs Also See for 30284:
Table of Contents

Advertisement

ELECTRICAL
5. Remove the OPC switch and spacer plate (Fig.
1562).

OPC Switch Installation (T-2)

1. Position the OPC switch and spacer plate onto the
motion control assembly plate (Fig. 1563).
9
9-52
Fig 1562
PICT-1932a
Fig 1563
PICT-1932a
2. Install 2 screws securing the OPC switch (and plate)
to the motion control assembly (Fig. 1564).
Fig 1564
3. Position the right hand control lever in the operating
position. There should be a .10" (2.54mm) gap
between the switch plunger and the control arm tab
(Fig. 1565).
A A
Fig 1565
A. .10" (2.54mm) gap
Floating Deck Mid-Size Service Manual
PICT-1928a
PICT-1934

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents