Fujitsu M10 Installation Manual page 242

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Figure 8-1     Installation patterns of building block configurations (up to the 8BB
Pattern A: Installation for expansion
New SPARC M10-4S
Figure 8-2     Installation patterns of building block configurations (up to the 16BB
Pattern C: Installation for expansion
Existing 4BB configuration
(1)
New SPARC M10-4S
(2)
In the above figures, "BB" indicates the SPARC M10-4S and "XBBOX" indicates a
crossbar box. The patterns in the figures correspond to
Note - The crossbar box (XBBOX), when shipped, is mounted in a dedicated rack (expansion
rack) together with dedicated power distribution units (PDUs) and crossbar cables.
Expansion racks are defined as expansion rack 1 and expansion rack 2 according to
expandability.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
228
configuration)
up to the 4BB configuration
4BB configuration
(1BB to 4BB)
BB
configuration)
up to the 16BB configuration
16BB configuration
(9BB to 16BB)
(1BB to 4BB)
BB
BB
BB
BB
BB
BB
BB
BB
XBBOX
or
XBBOX
BB
BB
BB
BB
BB
Expansion
rack 1
Pattern B: Installation for expansion
up to the 8BB configuration
Existing 4BB configuration
(1BB to 4BB)
BB
BB
(1)
BB
BB
BB
BB
BB
BB
or
New SPARC M10-4S
(2)
BB
Pattern D: Installation for expansion
up to the 16BB configuration
Existing 8BB configuration
(2BB to 8BB)
BB
BB
BB
BB
BB
BB
BB
BB
XBBOX
XBBOX
XBBOX
XBBOX
BB
BB
BB
BB
BB
BB
BB
BB
Expansion
Expansion rack 1
rack 2
8BB configuration
(2BB to 8BB)
BB
BB
BB
BB
XBBOX
XBBOX
BB
BB
BB
BB
Expansion rack 1
16BB configuration
(9BB to 16BB)
BB
BB
BB
BB
XBBOX
XBBOX
XBBOX
XBBOX
BB
BB
BB
BB
Expansion
Expansion
rack 1
rack 2
Table
8-1.
BB
BB
BB
BB
BB
BB
BB
BB

Advertisement

Table of Contents
loading

Table of Contents