Confirming Delivered Components - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

9.1.2

Confirming delivered components

To install the SPARC M10-4S, confirm the delivered components.
For details on the attachments for the chassis and the attachments required for a
building block configuration, see
the SPARC
The components that must be added vary depending on the installation pattern.
Table 9-1
expansion to up to the 4BB configuration with direct connections between chassis.
Table 9-1     Components that must be added during installation (up to the 4BB configuration)
No.
1
2
3
The configuration when two or more SPARC M10-4S units are added has a corresponding combination of the
components shown above.
*1 Use electrical cables for the connections in direct connections between chassis.
Any installation with expansion to the 5BB configuration or larger requires the new
installation of an expansion rack.
For installation with expansion to up to the 8BB configuration, expansion rack 1 is
required. For the 9BB to 16BB configurations, expansion rack 2 is required in addition
to expansion rack 1.
The dedicated power distribution units (PDUs), crossbar boxes, and cables required
for the installation are shipped mounted in the expansion racks. For details on the
components of expansion racks 1 and 2, see
components of an expansion
9.2
Installing the SPARC M10-4S
This section describes the procedure for installing only the SPARC M10-4S. This
procedure corresponds to patterns A and B (2) in
Figure
The SPARC M10-4S is installed in one of three ways: installation while the physical
partition (PPAR) that is the incorporation destination is operating, installation after
only the physical partition is stopped, or installation after the input power to the
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
240
M10-4S."
is a list of the components that must be added during installation for
Installation pattern
Installation for expansion
from 1BB to 2BB
Installation for expansion
from 2BB to 3BB
Installation for expansion
from 3BB to 4BB
rack."
8-2.
"3.2.3 Confirming the delivered components of
Name
Crossbar cable (electrical) (*1)
XSCF BB control cable
XSCF DUAL control cable
Crossbar cable (electrical) (*1)
XSCF BB control cable
Crossbar cable (electrical) (*1)
XSCF BB control cable
"3.2.5 Confirming the delivered
Figure 8-1
Quantity
8
1
1
16
2
24
2
as well as pattern C (2) in

Advertisement

Table of Contents
loading

Table of Contents