Fujitsu M10 Installation Manual page 267

Hide thumbs Also See for M10:
Table of Contents

Advertisement

are cases where no protection bracket is attached, depending on the installation. The blank
panel is secured with two M6 screws. The protection bracket is secured with four M6 screws.
Figure 9-2     Protection bracket
c. Set the ID of the target SPARC M10-4S.
For details, see
d. Connect the additional crossbar cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
Remarks - For connections through crossbar boxes, the additional crossbar cables are
secured to the expansion rack. When packed, the cables are tied to a rack column with their
connectors wrapped in a bag. Remove the cable connectors from the rack column and
unpack them. For details, see
e. Connect the additional XSCF BB control cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
f. If the installation expands the 1BB configuration to the multiple BB
configuration, connect the XSCF DUAL control cable from the BB#00 DUAL
port to the BB#01 DUAL port.
"4.1 Setting the ID (BB-ID) Identifying a
"Figure
4-13."
Chapter 9 Installing a System with a Building Block Configuration
A
Chassis."
"Appendix B
Configurations."
"4.2
Chassis)."
"Appendix B
Configurations."
"4.2
Chassis)."